The Work generally consists of replacing the
existing sanitary sewer lift station with a
new lift station. The major elements of the
Work include: a new sanitary sewer pump
station with wet well, valve vault, two 3 HP
pumps, controls and associated piping; 35 LF
of 4-inch PVC force main, 35 LF of 8-inch PVC
gravity sewer and one new sanitary sewer
manhole; new emergency generator;
rehabilitate 355-LF of existing 6-inch sewer
main by relining with cured-in-place pipe.
Additive bid alternate item: Provide 820-LF
of 2-inch conduit in Miles Lane from the pump
station to the north side of Freedom Blvd.