The work generally consists of replacing the existing sanitary sewer lift station with a new lift station. The major elements of the Work include: A new sanitary sewer pump station with wet well, valve vault, two 3HP pumps controls, and associated piping, 4-inch PVC force main and 8-inch gravity sewer, install owner-furnished lift station control panel automatic transfer switch and emergency standby generator, provide foundation for future propane storage tank.